top of page

Our Work

Some of our current and existing projects are outlined below, demonstrating how we were instructed to our assist our clients on each of the schemes. 

Kenilworth S104, PHC_edited_edited_edite

Kenilworth Main Infrastructure & Phase 2

Planning support, Detailed Design and S38/S104 Adoptions

As part of a phased land development, Grainger and Daniels were instructed by Persimmon Homes to produce the Levels and Drainage for circa 145 plots for Phase 2, along with progressing the planning and detailed design for the main infrastruture. 

Upwell Road, March 

Civil Design, S38/104/278 Adoptions

Grainger and Daniels were instructed by Allison Homes on this scheme to produce on-site design for a 110 plot development, along with extentisve off-site highway works. 

24030 - GD-XX-XX-DR-C-0501_P02 Section 104 Drainage Layout_page-0001.jpg
Cornhill LRH Appraisal.png

Cornhill, Cannock

Drainage Strategy and Supporting Levels

Grainger and Daniels were instructed by Levison Rose Homes to assist in producing and Drainage Strategy and Supporting Levels to aid with pre-planning support for their site of 3 plots in Cannock.

Wykham Park Farm, Phase 2 

Civil Design, S38 & S104, Cut & Fill Analysis

Grainger and Daniels were instructed by Persimmon Homes on this scheme to produce on-site design for a 95 plot development, along with detailed earthwork analysis. 

24026-GD-P2-XX-DR-C-111_P01 Cut & Fill Analysis_page-0001.jpg

Our Happy Clients

Persimmon_edited.png
images.png
Barratt.png
Levison Rose Homes.png
RB_Logo_Green_3840x2160-scaled.jpg
1686296608328.jpg

Contact Us

Thank you for contacting Grainger and Daniels Ltd. A member of the team will be in touch shortly

  • Black Facebook Icon
  • Black Instagram Icon
  • Black LinkedIn Icon
bottom of page